Next, we removed the toilet (always enjoyable). The flooring under and behind it had been rotted by a water leak that had occurred long ago. It had been fixed the old fashioned way: covered up with more boards and crap. We ripped out the offending boards:

We got a big piece of 3/4" plywood and made some cuts for the toilet and shower drain. The floor is now stronger than it has been in decades:

At this point in the project, we reached the turning point from demolition to construction. Everything old and undesirable is gone, and we have begun adding new material.